Client: Government of St. Vincent and the Grenadines
Design and Construction by CCA Limited
Start Date: November 15th, 2004
Completion Date: July 28th, 2005

The New Canouan Police Station was constructed on 1028 square meters/11065 square feet of land, which housed the previous Station. The building was designed by CCA limited to reflect the motives of the Canouan beautification program. The new Station is fully enclosed by fencing with two vehicle gate entrances, a main double door walk in entrance and a disabled ramp entrance, there are provisions for an emergency vehicle parking, two lots for visitor parking, and two covered parking lots within the compound.

The building comprises two levels and has a total floor area of 620 square meters / 6680 square feet, along with a 40,000 US gallon water storage cistern on a sub level.